MENU

9/9-11/8: 210 Reroutes for Grand Boulevard Bridge Construction

Date:August 30, 2024
Effective:Sep 09, 2024

Starting Monday, September 9, until November 8, the 210 Front Street bus will reroute for streetcar construction on the Grand Boulevard Bridge.

210 Front Street: Northbound buses will travel the Regular route to 7th & Grand, left on 7th St. to Wyandotte, right on Wyandotte to 6th St., right on 6th St., right on 6th St. to I-70 east entrance ramp, continuing on I-70 east to I-29 North to Front Street exit, right at Front Street to resume the regular route. Southbound buses will travel the egular route to I-29 south, left onto I-29 south entrance ramp, continuing onto I-70 west to Oak St, Grand Blvd, Walnut exit, then west onto Grand Blvd., and left on Grand to resume the regular route.

For route and schedule information, visit RideKC.org any time or call the RideKC Regional Call Center at (816) 221-0660, weekdays from 6 a.m. to 6 p.m. We offer translation assistance for trip information in more than 50 languages.

El Centro de Llamadas Regional de RideKC brinda asistencia con la traducción al 816-221-0660, de lunes a viernes de 6 a.m. a 6 p.m. Lo conectaremos con un intérprete que puede traducir la información del viaje en más de 50 idiomas.

Routes affected by this bulletin: